{"id":2835,"date":"2023-01-04T20:15:43","date_gmt":"2023-01-04T19:15:43","guid":{"rendered":"http:\/\/conafe.gov.cm\/s\/?p=2835"},"modified":"2023-06-28T17:01:53","modified_gmt":"2023-06-28T16:01:53","slug":"assessment-of-risks-related-to-the-implementation-of-the-roadmap","status":"publish","type":"post","link":"https:\/\/conafe.gov.cm\/s\/en\/monitoring-and-evaluation\/assessment-of-risks-related-to-the-implementation-of-the-roadmap\/","title":{"rendered":"Assessment of Risks related to the implementation of the Roadmap"},"content":{"rendered":"\n<p>Within the context of this Trade Facilitation Roadmap, risk should be understood as an unforeseen threat, which, if it occurs, could negatively affect the attainment of the objective or action. Risks could be general or specific.<\/p>\n\n\n\n<p><strong>I- GENERAL RISKS<br><\/strong>In a survey conducted by UNCTAD in January 2018, key stakeholders in trade facilitation in Cameroon expressed their opinion on the major general risks linked to the implementation of the Trade Facilitation Roadmap in Cameroon. Results show that resistance to change, political support, stability, the lack financial and human resources and sensitization on the importance of facilitating trade, constitute the major risks for Cameroon. These general risks are presented in the table below :<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"580\" height=\"484\" src=\"https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_01.png\" alt=\"\" class=\"wp-image-2836\" srcset=\"https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_01.png 580w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_01-400x334.png 400w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_01-250x209.png 250w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_01-150x125.png 150w\" sizes=\"(max-width: 580px) 100vw, 580px\" \/><\/figure><\/div>\n\n\n\n<p><strong>II- SPECIFIC RISKS<br><\/strong>Specific risks are connected to each action. A non-exhaustive list of risks linked to each action is developed in the table below:<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"646\" height=\"521\" src=\"https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_02.png\" alt=\"\" class=\"wp-image-2837\" srcset=\"https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_02.png 646w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_02-400x323.png 400w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_02-250x202.png 250w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_02-150x121.png 150w\" sizes=\"(max-width: 646px) 100vw, 646px\" \/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"641\" height=\"346\" src=\"https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_03.png\" alt=\"\" class=\"wp-image-2838\" srcset=\"https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_03.png 641w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_03-400x216.png 400w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_03-250x135.png 250w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_03-150x81.png 150w\" sizes=\"(max-width: 641px) 100vw, 641px\" \/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"650\" height=\"567\" src=\"https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_04-650x567.png\" alt=\"\" class=\"wp-image-2839\" srcset=\"https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_04-650x567.png 650w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_04-400x349.png 400w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_04-250x218.png 250w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_04-150x131.png 150w, https:\/\/conafe.gov.cm\/s\/wp-content\/uploads\/2023\/04\/risks_04.png 655w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/figure><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Within the context of this Trade Facilitation Roadmap, risk should be understood as an unforeseen threat, which, if it occurs, could negatively affect the attainment of the objective or action. Risks could be general or specific. I- GENERAL RISKSIn a survey conducted by UNCTAD in January 2018, key stakeholders in trade facilitation in Cameroon expressed [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2064,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[536],"tags":[],"lang":"en","translations":{"en":2835,"fr":1700},"pll_sync_post":[],"_links":{"self":[{"href":"https:\/\/conafe.gov.cm\/s\/wp-json\/wp\/v2\/posts\/2835"}],"collection":[{"href":"https:\/\/conafe.gov.cm\/s\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/conafe.gov.cm\/s\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/conafe.gov.cm\/s\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/conafe.gov.cm\/s\/wp-json\/wp\/v2\/comments?post=2835"}],"version-history":[{"count":1,"href":"https:\/\/conafe.gov.cm\/s\/wp-json\/wp\/v2\/posts\/2835\/revisions"}],"predecessor-version":[{"id":2840,"href":"https:\/\/conafe.gov.cm\/s\/wp-json\/wp\/v2\/posts\/2835\/revisions\/2840"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/conafe.gov.cm\/s\/wp-json\/wp\/v2\/media\/2064"}],"wp:attachment":[{"href":"https:\/\/conafe.gov.cm\/s\/wp-json\/wp\/v2\/media?parent=2835"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/conafe.gov.cm\/s\/wp-json\/wp\/v2\/categories?post=2835"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/conafe.gov.cm\/s\/wp-json\/wp\/v2\/tags?post=2835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}